Renovation work creates a short window when ceilings, walls and pathways are easier to access. A floor plan and a realistic device list can prevent last-minute drops, visible cable and avoidable rework after finishes are complete.

Mark the devices on the floor plan

Start with workstations, phones, printers, access points, cameras and any equipment that will need a network connection. Furniture plans can change the drop locations.

Choose the telecom-room or rack location

The rack location affects cable routes, patch panels, power coordination, access and how easy the equipment will be to service once the office is occupied.

Coordinate with the other trades

Ceiling access, electrical work, fire separation, millwork and drywall timing can change the route. Confirm when pathways will be open and who is responsible for each part of the work.

Count drops and leave practical room

Count the connections needed now, then consider spare pathway and rack capacity for normal changes. Extra capacity should be planned around the space, not added as a blanket number.

Bring the timing to the quote

Share when ceilings close, when furniture arrives and when the space needs to be usable. The sequence can matter as much as the drop count.

Renovating an office before the ceiling closes?

Include the floor plan, workstation or device locations and the construction timeline with your request. Those details help ICS identify the cabling decisions that need to happen first.

Request a Quote

Planning a cabling, network, Wi-Fi or security-infrastructure project? Share the site and scope you know so far.

ICS Project Quote Form

Tell us about your project and our team will get back to you.